Tunstall Arrow North, James Brindley Way,
Stoke-on-Trent ST6 5GF
3 New Industrial/Warehouse Units
from 13,533 sq ft to 31,170 sq ft
Strategically positioned close Junction 15 and 16 of the M6, via the A500 Phase 1 of the Tunstall Arrow South scheme has proved extremely successful and is fully let.
Tunstall Arrow North comprising of 5 new build units is now fully complete.
Units 1, 2 & 4 are available for immediate occupation with Unit 3 let to Wolseley and Unit 5 let to Speedy.
Space is flexible and if required units 2 and 4 can be combined to create one unit of 39,896 sq ft.
Location
ST6 5GF
Tunstall Arrow is located within Stoke-on-Trent, north of Tunstall town centre. Located within 5 minutes of the A500 dual carriageway which links to Junctions 15 and 16 of the M6 motorway.
The A500 also interconnects with the A50 dual carriage way providing a major east-west link with the A38 and M1 motorway.
Occupiers include Q-railing, DHL Express, Boels Rental, Pramac Generac and SG Fleet Solutions.
By Car
A500 | 1.7 miles/3 mins |
J15 M6 (South) | 9 miles/14 mins |
J16 M6 (North) | 6 miles/8 mins |
A50 Dual Carriage Way | 7 miles/10 mins |
M1 | 47 miles/50 mins |
By Train
London Euston | 1hr 30mins |
Crewe | 20 mins |
Manchester | 40 mins |
Birmingham | 50 mins |

Unit 1 - 31,170 SQ FT (2,896 SQ M)

Unit 1 Specification
- 10m eaves height
- Warehouse floor slab loading 50kn/m²
- Three 4m x 5m electronically operated loading doors
- Two dock levellers
- High-quality, fully-fitted ground and first floor offices and amenity area
- Male, female and mobility-impaired WCs
- Secure gated service yard and car parking area 37.5m yard depth
- 47 dedicated car park spaces
- 6 electric vehicle charging points
- 260 kVA 3-phase electricity supply / gas connection
- Access to super-fast broadband
Take The Tour

Unit 2 - 26,363 SQ FT (2,449 SQ M)
Unit 2 Specification
- Opportunity to combine with unit 4 to create 39,896 sq ft
- 8m eaves height
- Warehouse floor slab loading 50kn/m²
- Two 4m x 5m electronically operated loading doors
- One dock leveller
- High-quality, fully-fitted ground and first floor offices and amenity area
- Male, female and mobility-impaired WCs
- Secure gated service yard and car parking area
- 36m yard depth
- 37 dedicated car park spaces
- 4 electric vehicle charging points
- 220 kVA 3-phase electricity supply / gas connection
- Access to super-fast broadband
Take The Tour

Unit 4 - 13,533 SQ FT (1,257 SQ M)
Unit 4 Specification
- Opportunity to combine with unit 2 to create 39,896 sq ft
- 8m eaves height
- Warehouse floor slab loading 50kn/m²
- Two 4m x 5m electronically operated loading doors
- High-quality, fully-fitted ground and first floor
- Offices and amenity area
- Male, female and mobility-impaired WCs
- High-quality landscaped environment
- Service yard and car parking area
- 34.8m yard depth
- 15 dedicated car park spaces
- 4 electric vehicle charging points
- 120 kVA 3-phase electricity supply / gas connected
- Access to super-fast broadband